- STA Series Pro Concert Stage
-
Introduction:
Cinow STA Series Pro Concert Stages are designed for legs saving and fast setup. All the stages can be matched with telescopic legs and fixed legs. The Telescopic Legs and the legs balancers are good for any uneven floor.
- PDF Down
Product Detail
Application:
Cinow STA Series Pro Concert Stages are used in the events, indoor and outdoor concert, hotel ,exhibition market, wedding party, Arts and Cultural Performances, Amusements, the presentation of products, etc.
Features for STA Series Stages |
|
Model |
WSTA1212-4 |
Size(M) |
1.22*1.22*0.085 |
Legs needed |
There is one leg in each node among stages |
Loading(KG) |
950KG |
Self-Weight(KG) |
31.00KG |
Volume(CBM) |
0.131 |
Top Board |
1、18MM Poplar Film Faced Plywood ,Anti-Skidding &Water-Resistant Top Layer, ( Black coating, Red Coating, Unfinished, Clear Varnish ) 2、18MM Birch Film Faced Plywood ,Anti-Skidding & Water-Resistant Top Layer, ( Black coating, Red Coating, Unfinished, Clear Varnish ) 3、18MM Environmental Laminated Melamine Plywood (Many Colors Optional) 4、18MM Clear or Frosted Durable and Scratch-resistant Acrylic, Maximum allowable temperature 70° |
Aluminum Frame |
6061-T6 Aluminum Alloy ,Our Patented Specially extruded Aluminum Profile in 3MM thickness. The Top is bolted and glued to the frame to reduce the noise and vibration. All decks are available in metric and imperial sizes. |
DO |
1、Check to ensure the stage floor is properly aligned and completely level. 2、Check the application conditions of your stage, as the type of use is directly related to safety issues like handrails. 3、Brace your staging legs when needed for stability 4、Store your stages upside down to decrease setup time and maintain your stage at regular intervals. 5、Inform your crew beforehand on safe and correct installation procedures |
DO NOT |
1、Exceed the Maximum Allowable Load , Exceed the maximum building height of the stage or its support frame 2、Mix to be matched with different stages from different factories 3、Build stages in poor conditions, unstable ground, strong and continual raining days, the payload might be reduced substantially. 4、Apply loads before knowing their exact weight ,size and load. 5、Use unfinished Cinow Stage top board in outside conditions. 6、Use the hang-on profile without reducing the maximum allowable payload. 7、Use Cinow Elements as ballast for your roof without using the proper support frame. |